Step 8: Installation of air tubes and filter boxes
Piping and the air tubes and filter boxes installed into the tanks. All are cabled nicely. This was during the tank conditioning phase where the water is left to run and the testing of the system to ensure that there is no leakages.
0 Comments:
Post a Comment
<< Home